3.5. Can you install Quantum RF Series G6 on a 3 pin plug?



NO!  Quantum RF Series G6 must not be installed on a 3 pin plug. Against our Instructions

Dual supply installs should only be installed using a 20A Double Pole Switch for the off-peak & a 13A Switched Fused Spur for the 24 hr peak supply (hardwired).

Single supply installations should be on a 20A Double Pole Switch and meet the requirements for Single Supply.